In week 9, Keller Geoteknikk have mobilized the equipment along with RM20 for the foundation work of a new bridge over Eidselva river in Ulefoss. Our part of works include drilling of 16 pcs steel casings of Ø1016mm, distributed in 2 axes for column foundations and supporting the bridge span. Additionally, 20 steel core piles will be installed, with half in each abutment, divided by half in each land vessel.

Relieves traffic hazardous road
On the Odden-Lanna section, the road is close to existing listed residential buildings. The new road will divert most of the traffic between Ulefoss and Lunde away from this area.

Mobilization of the equipment for the foundation of a new bridge over Eidselva river
Published on