Skip to main content
english
norsk
english
+47 467 49 286
Service Menu
News
Events
Resources
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Dry soil mixing
Dynamic compaction
Mass mixing
Wet soil mixing
Wick / PVDs / band drains
Grouting
Cavity / bulk / mine fill grouting
Compensation / fracture grouting
Jet grouting
Compaction grouting
Permeation grouting
Rock / fissure grouting
Deep foundations
CFA piles (auger cast)
Driven precast piles
Ductile iron piles
Micropiles
Bored piles / drilled shafts
Macropiles
Earth retention
Contiguous pile walls
Secant pile walls
Ground anchors
SBMA
Soil nails
Sheet piles
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Liquefaction mitigation
Heavy foundations
Re-levelling structures
Underpinning
Containment
Excavation support
Stabilisation
Mine stabilisation/void filling
Tunnelling
Slope stabilisation
Markets
Commercial
Industrial
Infrastructure
Institutional / public
Power
Residential
Projects
How we work
Code of conduct
Values
Health and safety
Diversity and inclusion
Quality
Sustainability
About us
Our team
About Keller Group
Careers
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Invoicing
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Klemetsrud Tunnel Portal
Project
Klemetsrud Tunnel Portal Testing of soil nails with a hydraulic jack. 3 Soil Nail tests according to Eurocode. Soil Nailing The project The Klemetsrud tunnel portal is part of an infrastructure…
/en/projects/klemetsrud-tunnel-portal
E16 Eggemoen – Olum, Randselva Bridge
Project
E16 Eggemoen – Olum, Randselva Bridge Keller installed 40 pcs of Φ1.5m bored piles with a total length of about 900 m, both end bearing piles down to bedrock and 31 m long friction piles in sand.…
/en/projects/e16-eggemoen-olum-randselva-bridge
Årstafältet - Sheet Piles
Project
Årstafältet - Sheet Piles Execution of over 9000 square meters of permanent sheet piles up to 40m depth. Execution of over 250 pieces of permanent anchors with up to 60m depth. Monitoring of anchors…
/en/projects/arstafaltet-sheet-piles
Backa Bergögata
Project
Backa Bergögata • Keller installed around 3 000 pcs of dry deep soil mixing columns (DSM). • Ground improvement for slope stabilization. • Ø600 mm columns (13 to 14 m), binder: Multicem, 100 kg/m3…
/en/projects/backa-bergogata
Arbetstunnel Hagalund Excavation Support
Project
Arbetstunnel Hagalund Excavation Support • Keller installed 1700m2 sheet piles (VL 603, 606), beams and struts (UPE 300 and HEB). • Rock dowels 132 pcs Ø 100 mm. • Jet-Grouting 199 pcs of Ø1m columns…
/en/projects/arbetstunnel-hagalund-excavation-support
KV. TABELLEN SOLLENTUNA
Project
KV. TABELLEN SOLLENTUNA • Keller installed over 5420m 2 sheet piles (VL 603, 604), 2000m beams and struts (HEB300). • Jet-Grouting 1430m2 Ø1m columns and 105pcs to seal and support sheet pile box. •…
/en/projects/kv-tabellen-sollentuna
Nytt Sykehus i Drammen
Project
Nytt Sykehus i Drammen Keller installed 125 pcs, Ø273, Ø323 and Ø406 casings for steel core piles with a total length of about 8600 m and average pile lengths of about 70 m. All casings were…
/en/projects/nytt-sykehus-i-drammen
Ekerød Felt 2
Project
Ekerød Felt 2 Keller installed 1400 pcs of vertical drains with a total length of 12 000 m. The drains were installed with Keller own drilling rig specially adapted to the method. Vertical drains The…
/en/projects/ekerod-felt-2
Sluppenveien 23
Project
Sluppenveien 23 Keller installed 1667 lime-cement columns with diameter of 600 mm. A total of 20 000 meter of soil was mixed. LCC Sluppenveien The project Sluppen is a developing area in Trondheim.…
/en/projects/sluppenveien-23
E16 Bjørum-Skaret
Project
E16 Bjørum-Skaret Keller installed about 2100 pcs of Ø800 mm lime-cement columns to stabilize the ground nearby a new future road bridge for the project E16 Bjørum-Skaret. The lime-cement columns…
/en/projects/e16-bjorum-skaret
EPC SKI SP15-Jet Grouting
Project
EPC SKI SP15-Jet Grouting • Execution of Jet-grouting under and around existing sheet pile wall. • Jet-grouting in sensitive clays and quick clays. • Achievement of high requirements regarding…
/en/projects/epc-ski-sp15-jet-grouting
Brakerøya Stasjon
Project
Brakerøya Stasjon Keller installed 8 pcs of Ø219 steel core piles, 82 pcs of Ø219 casings for a pile wall and stiffeners and struts for the pit with HEB280 beams. Keller’s in house developed drilling…
/en/projects/brakeroya-stasjon
Evje Ridehall
Project
Evje Ridehall Keller installed about 3300 pcs of Ø800 mm lime-cement columns to stabilize the ground under a new private building for horses. The lime-cement columns were installed in a predefined…
/en/projects/evje-ridehall
Nittedal Station
Project
Nittedal Station Keller installed 67 pcs of Ø323 casings for a pile wall and 10 pcs of 19m anchors in 5 days. All works were done during a 10-day shutdown of the railway line at Nittedal Station.…
/en/projects/nittedal-station
Åse Bru
Project
Åse Bru Execution of a steel pile foundation with a diameter of 813mm by using the Reverse Circulation drilling method (RC-drilling). Challenging environmental aspects. Åse Bru The project On behalf…
/en/projects/ase-bru
Radiumhospitalet
Project
Radiumhospitalet Key achievements • Shoring walls consisting of Bored Piles, Jet Grouting, Rock Injections and Ground Anchors to retain the excavation pit of up to 15m depth. • Dry Deep Soil Mixing…
/en/projects/radiumhospitalet
Austvoll Bridge
Project
Austvoll Bridge Pre-drilling for sheet piling in moraine. Replacement of soil with sand. Drilling with Ø610 mm casing. 80 points of around 1200 m in total. Sheet piles Austvoll The project…
/en/projects/austvoll-bridge
Oslo S (Summer Shutdown 2021)
Project
Oslo S (Summer Shutdown 2021) • Installation of sheet piles in close proximity to live railway traffic. • Execution of almost 3,500m of jet grouting columns (column diameters up to 2.2m). • For…
/en/projects/oslo-s-summer-shutdown-2021
Bergerløkka
Project
Bergerløkka Keller drilled and installed 1 389 lime-cement columns for the foundation of new apartments. The work result was 10 000 meters stabilized meters with ø600mm columns. Bergerløkka LCC The…
/en/projects/bergerlokka
Follo Line Ski RW SP4-5
Project
Follo Line Ski RW SP4-5 • Shoring walls consisting of Steel Piles, Ground Anchors and Shotcrete to retain the excavation of up to 7m depth. • 391 Steel Piles (5950 m), 199 Ground Anchors (5400 m) and…
/en/projects/follo-line-ski-rw-sp4-5
Pagination
Previous page
‹‹
Page 2
Next page
››