Skip to main content
english
  • norsk
  • english
+47 467 49 286
Service Menu
  • News
  • Events
  • Resources
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Dry soil mixing
        • Mass mixing
        • Wet soil mixing
        • Wick / PVDs / band drains
      • Grouting
        • Cavity / bulk / mine fill grouting
        • Compensation / fracture grouting
        • Jet grouting
        • Compaction grouting
        • Permeation grouting
        • Rock / fissure grouting
      • Deep foundations
        • CFA piles (auger cast)
        • Driven precast piles
        • Ductile iron piles
        • Micropiles
        • Bored piles / drilled shafts
      • Earth retention
        • Contiguous pile walls
        • Secant pile walls
        • Ground anchors
        • SBMA
        • Soil nails
        • Sheet piles
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Liquefaction mitigation
        • Heavy foundations
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Stabilisation
        • Mine stabilisation/void filling
        • Tunnelling
      • Slope stabilisation
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Diversity and inclusion
    • Quality
    • Sustainability
  • About us
    • Our team
    • About Keller Group
  • Careers
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Invoicing

Search results

Filter results

  • All results (196)
  • Content page (35)
  • Event (2)
  • Market (6)
  • News article (16)
  • Office (1)
  • Project (71)
  • Resource (32)
  • Solution (10)
  • Technique (21)
  • Vacancy (2)
Request a quote
Get assistance
Download
Keller at a glance
Resource
Facts and figures about Keller Group
/en/node/1341
Download
Jet grouting brochure
Resource
An efficient and versatile method for soil treatment
/en/node/2741
Download
Soil mixing brochure
Resource
An efficient and flexible technology to overcome a variety of soil problems
/en/node/2756
Download
CFA brochure
Resource
A fast and economical piling solution for a variety of applications
/en/node/2766
Download
https://youtu.be/eRoxI3-eh_Y
Keller in Norway
Resource
Showcasing some of the our work in Oslo in summer 2019
/en/node/2771
Download
https://youtu.be/PAyh3VXU508
Keller Follo Line Documentary
Resource
Have you always wanted to know how Keller carries out a large construction site? This documentary gives you an insight into our "Follo Line" project in Oslo, Norway. This is the largest infrastructure project in Norway. Once finished, it will include the country´s longest railway tunnel,…
/en/node/2911
Download
https://youtu.be/teIgY9gnhBo
E16 Eggemoen–Olum project documentary
Resource
Exciting new documentary showcasing bored piles and steel core piles geotechnical solutions in Norway. E16 Eggemoen–Olum project is a public road project in the area of Jevnaker north of Oslo. Keller Geoteknikk took part in the project for the foundation of the bridge applying several geotechnical…
/en/node/2966
Download
Bored piles and pile walls
Resource
An economical foundation element to support high structural loads with minimal settlement.
/en/node/2991
Download
Soilcrete - Jet grouting
Resource
One of the most efficient and flexible soil treatment methods to create structures for load bearing and sealing in geotechnics
/en/node/2996
Download
Anchors, micropiles and soil nailing
Resource
Flexible solutions to transfer tensile or compression loads in challenging situations
/en/node/3001
Download
https://youtu.be/yTalxKwgwOI
Thank You for 2020
Resource
Keller SEN video from various construction sites
/en/node/3016
Download
Building a better world
Resource
Enabling low-impact, low carbon construction
/node/3086
Download
https://www.youtube.com/watch?v=ouYEyn7WAnU
Keller in Norway 2020-2021
Resource
Our new video shows an overview of Keller's activity in Norway during 2020-2021. Have a closer look at our projects 'SMS2a' in Moss, 'Radiumhospitalet' in Oslo, 'Drammen hospital' in Drammen, 'Ski train station' in Ski and 'E16 Eggemoen-Olum'.…
/en/node/3106
Download
Diversity, equity and inclusion
Resource
October is Global Diversity Awareness Month and an opportunity to celebrate and increase awareness about diversity, and the positive impact it has in the workplace and wider society.
/en/node/3166
Download
https://youtu.be/cd24z09498I
Global Diversity Awareness
Resource
Global Diversity Awareness Month is a chance to reflect on progress, share stories, learn and encourage everyone to continue to play their part. Hear members of our Keller team share their experience.
/en/node/3171
Download
Follo Line Ski RW SP4-5
Resource
The Follo Line Ski project is part of the new high-speed railway line between Oslo and Ski. After completion in 2022, Ski will have a modern transport hub with three platforms and a completely renewed station area.To build the tracks north of the station a permanent retaining wall had to be built.
/en/node/3186
Download
HAB K144 Summer Shutdown 2021
Resource
In summer 2021, the Folloline Project planned a train shutdown for continuing the works near Oslo main train station. This involved geotechnical works like Micropiling, Jet grouting and Sheet piling near active tracks as well as preparational works for a future excavation pit, beside and inside an…
/en/node/3191
Download
Bergerløkka
Resource
Bergerløkka is located at Billingstad in Asker municipality and is a construction project where JM builds a new apartment complex. The rural area will at the end of the project comprise over 500 attractive apartments close to the Oslo city.
/en/node/3196
Download
Radiumhospitalet
Resource
In 2017, Oslo Commune decided to invest in the re-development of the existing Radiology Hospital. The project was labelled high priority due to the significant growth seen in the Oslo region. The first proton center in Norway, advanced technology in radiation therapy, will be established within the…
/en/node/3201
Download
Austvoll Bridge
Resource
Fundamentering AS (FAS) had been contracted by Implenia to establish the sheet piling pits for the new bridge, «Austvoll bru», near Flå. Due to difficult ground conditions with a lot of stones and moraine there was a need to predrill the ground before the sheet piling could continue. Keller were…
/en/node/3206
  • Show more results
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Geoteknikk AS

Keller Geoteknikk AS
Hovfaret 13
0275 Oslo

Footer links
  • Keller Group
  • Careers

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • YouTube