Skip to main content
english
norsk
english
+47 467 49 286
Service Menu
News
Events
Resources
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Dry soil mixing
Dynamic compaction
Mass mixing
Wet soil mixing
Wick / PVDs / band drains
Grouting
Cavity / bulk / mine fill grouting
Compensation / fracture grouting
Jet grouting
Compaction grouting
Permeation grouting
Rock / fissure grouting
Deep foundations
CFA piles (auger cast)
Driven precast piles
Ductile iron piles
Micropiles
Bored piles / drilled shafts
Macropiles
Earth retention
Contiguous pile walls
Secant pile walls
Ground anchors
SBMA
Soil nails
Sheet piles
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Liquefaction mitigation
Heavy foundations
Re-levelling structures
Underpinning
Containment
Excavation support
Stabilisation
Mine stabilisation/void filling
Tunnelling
Slope stabilisation
Markets
Commercial
Industrial
Infrastructure
Institutional / public
Power
Residential
Projects
How we work
Code of conduct
Values
Health and safety
Diversity and inclusion
Quality
Sustainability
About us
Our team
About Keller Group
Careers
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Invoicing
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Ringerike VGS
Project
Ringerike VGS The Buskerud commune is expanding its 19th century Ringerike school complex to keep up with the growing community of the city of Hønefoss. Keller was contracted to secure the foundation…
/en/projects/ringerike-vgs
Follo Line Oslo S K143
Project
Follo Line Oslo S K143 Keller installed 10,400m of jet grouted columns in just 21 days to meet a tight deadline during a rail line closure on the Follo Line project. Project reference Norway Jet…
/en/projects/follo-line-oslo-s-k143
Ski Follo Line Railway and Train Station
Project
Ski Follo Line Railway and Train Station The Follo Line project is the largest infrastructure project in Norway. It includes 22 km of new high speed railway from Oslo to Ski. Project references…
/en/projects/ski-follo-line-railway-and-train-station
Excavation pit, Follo Line
Project
Excavation pit, Follo Line The Follo Line project is currently the largest infrastructure project in Norway. Here, Keller installed around 8000m of temporary anchors for retaining walls with up to 10…
/en/projects/excavation-pit-follo-line
Mosseveien Portal
Project
Mosseveien Portal The Follo Line project is currently the largest infrastructure project in Norway. On this job, Keller installed around 1000pc of Jet grouting columns to support the excavation of a…
/en/projects/mosseveien-portal
Follo Line Railway and Railway Tunnel Dry Soil Mixing
Project
Follo Line Railway and Railway Tunnel Dry Soil Mixing The Follo Line project is the largest infrastructure project in Norway. It includes 22 km of new railway from Oslo to Ski. Dry Deep Soil Mixing…
/en/projects/follo-line-railway-and-railway-tunnel-dry-soil-mixing
Follo Line Railway and Railway Tunnel Jet Grouting
Project
Follo Line Railway and Railway Tunnel Jet Grouting The Follo Line project is currently the largest infrastructure project in Norway. The project includes 22 km of new railway from Oslo to Ski. Jet…
/en/projects/follo-line-railway-and-railway-tunnel-jet-grouting
Oslo S K-136 & K-132
Project
Oslo S K-136 & K-132 The foundation works in K136 and K132 are part of the Folloline project which is currently the largest infrastructure project in Norway. The project includes 22 km of new…
/en/projects/oslo-s-k-136-k-132
Follobanen Railway and Tunnel RingBit System
Project
Follobanen Railway and Tunnel RingBit System In the project Keller installed around 1.500 pcs steel core piles Over 60 000m, Ø273mm piles with Ø150mm and Ø180mm steel core Keller executed this…
/en/projects/follobanen-railway-and-tunnel-ringbit-system
HAB-FOLLOLINE K147
Project
HAB-FOLLOLINE K147 Execution of steel core piles with lengths up to 50m in a restricted access area. Many underground service lines in working area existing, which were obstacles to drilling and lead…
/en/projects/hab-folloline-k147
Parkveien 4, Langhus
Project
Parkveien 4, Langhus Keller installed around 2400 pcs of Ø600 mm and Ø800 mm Lime Cement Columns as ground stabilization for a new apartment building in Langhus. The Lime Cement columns were…
/en/projects/parkveien-4-langhus
Miklagard Fase 2
Project
Miklagard Fase 2 Keller installed around 3000 pcs of Ø800mm Lime Cement Columns as ground stabilization for a new Hotel in Kløfta. The ground consisted of soft clay and had to be stabilized before…
/en/projects/miklagard-fase-2
Wildenvey Park
Project
Wildenvey Park Keller installed 378 pcs of Ø600mm Lime Cement Columns within a small construction pit in Mjøndalen. The construction pit was made to establish a pump station to control future flood…
/en/projects/wildenvey-park
Bernt Akers Gate 6
Project
Bernt Akers Gate 6 Keller installed 20 pcs of jet grouting columns with diameters of 1,5 m, 1,6 m and 2,0 m and lengths varying from 3 to 16 meters in clay. All columns was installed from within the…
/en/projects/bernt-akers-gate-6
Bjugn
Project
Bjugn Keller installed around 1 500 pcs of Ø700 mm Lime Cement Columns as ground stabilization after a land slide with quick clay under construction of a new football field. The Lime Cement columns…
/en/projects/bjugn
EPC Folloline -Ski Anchor Works
Project
EPC Folloline -Ski Anchor Works • Anchortest to verify the anchor system and bearing capacity of the anchors. • Installation of five vertical permanent ground anchors up to 35m length. • Anchors with…
/en/projects/epc-folloline-ski-anchor-works
RV4 Elvetangen
Project
RV4 Elvetangen Jet grouting for sealing between bedrock and sheet piles for a building pit in Nittedal. Keller installed around 140 pcs of jet grouting columns with diameters of 1,2m and lengths…
/en/projects/rv4-elvetangen
Bruket Brygge Soil Stabilization
Project
Bruket Brygge Soil Stabilization Installation of 389 Lime Cement Columns of Ø600 mm after large settlements occurred due to overloaded sensitive clay. 4.600m of stabilized length executed in 5 days…
/en/projects/bruket-brygge-soil-stabilization
Piren Mandal Compaction Grouting
Project
Piren Mandal Compaction Grouting Keller installed 51 columns distributed over 12 foundations by compaction grouting to stabilize 2 buildings which faced large settlements The soil,dominated by sand…
/en/projects/piren-mandal-compaction-grouting
Folloline Oslo S - K 144
Project
Folloline Oslo S - K 144 Keller installed 280 pcs, Φ1.2m – 4.051m of Jet Grouting Columns in 15 days. Two Keller Jet Grouting rigs worked day and night to achieve the schedule from the Client. 3…
/en/projects/folloline-oslo-s-k-144