Skip to main content
english
  • norsk
  • english
+47 240 77 887
Service Menu
  • News
  • Events
  • Resources
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Deep soil mixing (dry method)
        • Dynamic compaction
        • Mass mixing
        • Deep soil mixing (wet method)
        • Wick / PVDs / band drains
      • Grouting
        • Cavity / bulk / mine fill grouting
        • Compensation / fracture grouting
        • Jet grouting
        • Compaction grouting
        • Permeation grouting
        • Rock / fissure grouting
      • Deep foundations
        • CFA piles (auger cast)
        • Driven precast piles
        • Ductile iron piles
        • Micropiles
        • Bored piles / drilled shafts
        • Macropiles
      • Earth retention
        • Contiguous pile walls
        • Secant pile walls
        • Ground anchors
        • SBMA
        • Soil nails
        • Sheet piles
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Liquefaction mitigation
        • Heavy foundations
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Stabilisation
        • Mine stabilisation/void filling
        • Tunnelling
      • Slope stabilisation
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Diversity and inclusion
    • Quality
    • Sustainability
  • About us
    • Our team
    • About Keller Group
  • Careers
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Invoicing

Search results

Filter results

  • All results (212)
  • Project (74)
  • Content page (35)
  • Resource (32)
  • News article (23)
  • Technique (23)
  • Solution (10)
  • Market (6)
  • Landing page (3)
  • Office (3)
  • Event (2)
  • Vacancy (1)
Request a quote
Get assistance
Excavation support
Solution
Excavation support During construction it is often necessary to form a stable excavation and to ensure that any associated movement will not damage neighbouring structures or utilities.  Keller…
/en/expertise/solutions/excavation-support
Keller at a glance
Resource
Keller at a glance Keller at a glance infographic Flyer Facts and figures about Keller Group Download
/en/node/1341
How we work
Landing page
How we work man in yellow jacket with keller logo on the back Code of conduct Our business code of conduct sets out the principles and standards of behaviour we expect from all our employees. Our…
/en/how-we-work
Commercial
Market
Commercial Keller provides geotechnical solutions for the commercial market sector for both existing and planned structures, including office buildings, hotels, distribution centres, retail, data…
/en/expertise/markets/commercial
Macropiles
Technique
Macropiles A macropile® is an ultra-high capacity micropile, with high strength grout, steel reinforcement, and increased diameter over 300mm. Keller rigs demonstrating macropile technique Common…
/en/expertise/techniques/macropiles
Industrial
Market
Industrial Keller designs and constructs cost-effective build or design-build geotechnical solutions for the industrial and manufacturing sector. Keller Geoteknikk Industrial Sector challenges we can…
/en/expertise/markets/industrial
Power
Market
Power Keller has wide experience of provide the energy sector with cost-effective solutions to ground problems. Keller Geoteknikk working wet soil Sector challenges we can solve Whether for bio,…
/en/expertise/markets/power
Institutional / public
Market
Institutional / public Keller can provide solutions for the full range of institutional structures including government and military, education, healthcare, and sports and entertainment. Keller-…
/en/expertise/markets/institutional-public
Bearing capacity / settlement control
Solution
Bearing capacity / settlement control Soils often need treating to support the weight of a building or to withstand the loads imposed by a piece of infrastructure. This can mean improving the ground…
/en/expertise/solutions/bearing-capacity-settlement-control
Code of conduct
Content page
Code of conduct We are known and respected for our high standards of fairness, integrity and honesty in our relations with our employees, customers, suppliers, competitors and the community. As this…
/en/how-we-work/code-conduct
Quality
Content page
Quality We ensure that we deliver consistently high performance and continuously improve to meet our customer's needs. 5S in action at Keller We do this by: Making all employees and stakeholders…
/en/how-we-work/quality
Learning and development
Content page
Learning and development We invest in our people’s professional and personal development and provide a challenging environment for them to exercise their skills. learning and development Providing…
/en/careers/learning-and-development
Applying to work with us
Content page
Applying to work with us We recruit people from a wide variety of backgrounds, and with different skills and experience. If you feel you have the energy and passion to make a difference across a…
/en/careers/applying-work-us
Ringerike VGS
Project
Ringerike VGS The Buskerud commune is expanding its 19th century Ringerike school complex to keep up with the growing community of the city of Hønefoss. Keller was contracted to secure the foundation…
/en/projects/ringerike-vgs
Follo Line Oslo S K143
Project
Follo Line Oslo S K143 Keller installed 10,400m of jet grouted columns in just 21 days to meet a tight deadline during a rail line closure on the Follo Line project. Project reference Norway Jet…
/en/projects/follo-line-oslo-s-k143
Ski Follo Line Railway and Train Station
Project
Ski Follo Line Railway and Train Station The Follo Line project is the largest infrastructure project in Norway. It includes 22 km of new high speed railway from Oslo to Ski. Project references…
/en/projects/ski-follo-line-railway-and-train-station
Excavation pit, Follo Line
Project
Excavation pit, Follo Line The Follo Line project is currently the largest infrastructure project in Norway. Here, Keller installed around 8000m of temporary anchors for retaining walls with up to 10…
/en/projects/excavation-pit-follo-line
Follo Line Railway and Railway Tunnel Dry Soil Mixing
Project
Follo Line Railway and Railway Tunnel Dry Soil Mixing The Follo Line project is the largest infrastructure project in Norway. It includes 22 km of new railway from Oslo to Ski.  Dry Deep Soil Mixing…
/en/projects/follo-line-railway-and-railway-tunnel-dry-soil-mixing
Jet grouting brochure
Resource
Jet grouting brochure Jet grouting brochure Brochure An efficient and versatile method for soil treatment Download
/en/node/2741
Follo Line Railway and Railway Tunnel Jet Grouting
Project
Follo Line Railway and Railway Tunnel Jet Grouting The Follo Line project is currently the largest infrastructure project in Norway. The project includes 22 km of new railway from Oslo to Ski.   Jet…
/en/projects/follo-line-railway-and-railway-tunnel-jet-grouting

Pagination

  • Page 1
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Geoteknikk AS

Keller Geoteknikk AS
Hovfaret 13
0275 Oslo

Footer links
  • Keller Group
  • Careers

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • YouTube