Skip to main content
english
norsk
english
+47 467 49 286
Service Menu
News
Events
Resources
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Dry soil mixing
Dynamic compaction
Mass mixing
Wet soil mixing
Wick / PVDs / band drains
Grouting
Cavity / bulk / mine fill grouting
Compensation / fracture grouting
Jet grouting
Compaction grouting
Permeation grouting
Rock / fissure grouting
Deep foundations
CFA piles (auger cast)
Driven precast piles
Ductile iron piles
Micropiles
Bored piles / drilled shafts
Macropiles
Earth retention
Contiguous pile walls
Secant pile walls
Ground anchors
SBMA
Soil nails
Sheet piles
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Liquefaction mitigation
Heavy foundations
Re-levelling structures
Underpinning
Containment
Excavation support
Stabilisation
Mine stabilisation/void filling
Tunnelling
Slope stabilisation
Markets
Commercial
Industrial
Infrastructure
Institutional / public
Power
Residential
Projects
How we work
Code of conduct
Values
Health and safety
Diversity and inclusion
Quality
Sustainability
About us
Our team
About Keller Group
Careers
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Invoicing
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Macropiles
Technique
Macropiles A macropile® is an ultra-high capacity micropile, with high strength grout, steel reinforcement, and increased diameter over 300mm. Keller rigs demonstrating macropile technique Common…
/en/expertise/techniques/macropiles
Micropiles
Technique
Micropiles Micropiles, also known as minipiles, pin piles, needle piles, and root piles, are a deep foundation element constructed using high-strength, small-diameter steel casing and/or threaded…
/en/expertise/techniques/micropiles
Bored piles / drilled shafts
Technique
Bored piles / drilled shafts Bored piles are a very effective, state-of-the-art construction element with many applications in foundation and civil engineering. bored-piles Common uses As heavy…
/en/expertise/techniques/bored-piles-drilled-shafts
Secant pile walls
Technique
Secant pile walls A secant pile wall consists of overlapping (secant) piles to form structural or cutoff walls and achieve the required water tightness. The design can incorporate steel bar or beams…
/en/expertise/techniques/secant-pile-walls
Industrial
Market
Industrial Keller designs and constructs cost-effective build or design-build geotechnical solutions for the industrial and manufacturing sector. Keller Geoteknikk Industrial Sector challenges we can…
/en/expertise/markets/industrial
Power
Market
Power Keller has wide experience of provide the energy sector with cost-effective solutions to ground problems. Keller Geoteknikk working wet soil Sector challenges we can solve Whether for bio,…
/en/expertise/markets/power
Institutional / public
Market
Institutional / public Keller can provide solutions for the full range of institutional structures including government and military, education, healthcare, and sports and entertainment. Keller-…
/en/expertise/markets/institutional-public
Slope stabilisation
Solution
Slope stabilisation Keller draws on its extensive experience with the full range of techniques to provide optimal slope stabilisation solutions for various projects. Slope stabilisation
/en/expertise/solutions/slope-stabilisation
Bearing capacity / settlement control
Solution
Bearing capacity / settlement control Soils often need treating to support the weight of a building or to withstand the loads imposed by a piece of infrastructure. This can mean improving the ground…
/en/expertise/solutions/bearing-capacity-settlement-control
Code of conduct
Content page
Code of conduct We are known and respected for our high standards of fairness, integrity and honesty in our relations with our employees, customers, suppliers, competitors and the community. As this…
/en/how-we-work/code-conduct
Values
Content page
Values Our values are what we have judged are most important to how we want to work: Employees on site discussing project Integrity We always behave with integrity towards our customers, colleagues…
/en/how-we-work/values
Quality
Content page
Quality We ensure that we deliver consistently high performance and continuously improve to meet our customer's needs. 5S in action at Keller We do this by: Making all employees and stakeholders…
/en/how-we-work/quality
Learning and development
Content page
Learning and development We invest in our people’s professional and personal development and provide a challenging environment for them to exercise their skills. learning and development Providing…
/en/careers/learning-and-development
Applying to work with us
Content page
Applying to work with us We recruit people from a wide variety of backgrounds, and with different skills and experience. If you feel you have the energy and passion to make a difference across a…
/en/careers/applying-work-us
Oslo (Corporate office)
Office
Oslo (Corporate office) Keller Geoteknikk AS Oslo T: +4746749286 +4746749286 M: F:
[email protected]
www.keller-geoteknikk.no Hovfaret 13 0275 Oslo Key contacts E:
[email protected]
E:…
/en/contact-us/oslo
Ringerike VGS
Project
Ringerike VGS The Buskerud commune is expanding its 19th century Ringerike school complex to keep up with the growing community of the city of Hønefoss. Keller was contracted to secure the foundation…
/en/projects/ringerike-vgs
Follo Line Oslo S K143
Project
Follo Line Oslo S K143 Keller installed 10,400m of jet grouted columns in just 21 days to meet a tight deadline during a rail line closure on the Follo Line project. Project reference Norway Jet…
/en/projects/follo-line-oslo-s-k143
Ski Follo Line Railway and Train Station
Project
Ski Follo Line Railway and Train Station The Follo Line project is the largest infrastructure project in Norway. It includes 22 km of new high speed railway from Oslo to Ski. Project references…
/en/projects/ski-follo-line-railway-and-train-station
Excavation pit, Follo Line
Project
Excavation pit, Follo Line The Follo Line project is currently the largest infrastructure project in Norway. Here, Keller installed around 8000m of temporary anchors for retaining walls with up to 10…
/en/projects/excavation-pit-follo-line
Mosseveien Portal
Project
Mosseveien Portal The Follo Line project is currently the largest infrastructure project in Norway. On this job, Keller installed around 1000pc of Jet grouting columns to support the excavation of a…
/en/projects/mosseveien-portal
Pagination
Previous page
‹‹
Page 2
Next page
››