Skip to main content
english
  • norsk
  • english
+47 467 49 286
Service Menu
  • News
  • Events
  • Resources
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Dry soil mixing
        • Dynamic compaction
        • Mass mixing
        • Wet soil mixing
        • Wick / PVDs / band drains
      • Grouting
        • Cavity / bulk / mine fill grouting
        • Compensation / fracture grouting
        • Jet grouting
        • Compaction grouting
        • Permeation grouting
        • Rock / fissure grouting
      • Deep foundations
        • CFA piles (auger cast)
        • Driven precast piles
        • Ductile iron piles
        • Micropiles
        • Bored piles / drilled shafts
        • Macropiles
      • Earth retention
        • Contiguous pile walls
        • Secant pile walls
        • Ground anchors
        • SBMA
        • Soil nails
        • Sheet piles
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Liquefaction mitigation
        • Heavy foundations
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Stabilisation
        • Mine stabilisation/void filling
        • Tunnelling
      • Slope stabilisation
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Diversity and inclusion
    • Quality
    • Sustainability
  • About us
    • Our team
    • About Keller Group
  • Careers
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Invoicing

Search results

Filter results

  • All results (205)
  • Project (74)
  • Content page (35)
  • Resource (32)
  • Technique (23)
  • News article (17)
  • Solution (10)
  • Market (6)
  • Landing page (3)
  • Event (2)
  • Vacancy (2)
  • Office (1)
Request a quote
Get assistance
Follo Line Railway and Railway Tunnel Dry Soil Mixing
Project
Follo Line Railway and Railway Tunnel Dry Soil Mixing The Follo Line project is the largest infrastructure project in Norway. It includes 22 km of new railway from Oslo to Ski.  Dry Deep Soil Mixing…
/en/projects/follo-line-railway-and-railway-tunnel-dry-soil-mixing
Download
Jet grouting brochure
Resource
Jet grouting brochure Jet grouting brochure Brochure An efficient and versatile method for soil treatment Download
/en/node/2741
Follo Line Railway and Railway Tunnel Jet Grouting
Project
Follo Line Railway and Railway Tunnel Jet Grouting The Follo Line project is currently the largest infrastructure project in Norway. The project includes 22 km of new railway from Oslo to Ski.   Jet…
/en/projects/follo-line-railway-and-railway-tunnel-jet-grouting
Download
Soil mixing brochure
Resource
Soil mixing brochure Soil mixing cover image Brochure An efficient and flexible technology to overcome a variety of soil problems Download
/en/node/2756
Oslo S K-136 & K-132
Project
Oslo S K-136 & K-132 The foundation works in K136 and K132 are part of the Folloline project which is currently the largest infrastructure project in Norway. The project includes 22 km of new…
/en/projects/oslo-s-k-136-k-132
Download
CFA brochure
Resource
CFA brochure CFA brochure Brochure A fast and economical piling solution for a variety of applications Download
/en/node/2766
Download
https://youtu.be/eRoxI3-eh_Y
Keller in Norway
Resource
Keller in Norway Keller in Norway summer 2019 Video Showcasing some of the our work in Oslo in summer 2019 Download https://youtu.be/eRoxI3-eh_Y
/en/node/2771
Keller wins global projects award for work on Follo Line
News article
Keller wins global projects award for work on Follo Line News article category Project Keller’s work on the prestigious Follo Line Project in Norway has won an Award of Merit in the Rail category at…
/en/news/keller-wins-global-projects-award-work-follo-line
Peleveiledning
Event
Peleveiledning Oslo, Norway Quality Airport Hotel Gardermoen 6 Nov - 7 Nov 2019 Seminar http://mm.event123.no/NGF2018/Pelekurs2019/forsiden.cfm
/en/events/peleveiledning
Geotechnical Days 2019
Event
Geotechnical Days 2019 Oslo, Norway Radisson Blu Scandinavia Hotel Holbergs Plass 21 Nov - 22 Nov 2019 Conference https://www.tekna.no/kurs/fjellsprengningskonferansen-2019-38245/fjellsprengnin…
/en/events/geotechnical-days-2019
Follobanen Railway and Tunnel RingBit System
Project
Follobanen Railway and Tunnel RingBit System In the project Keller installed around 1.500 pcs steel core piles Over 60 000m, Ø273mm piles with Ø150mm and Ø180mm steel core Keller executed this…
/en/projects/follobanen-railway-and-tunnel-ringbit-system
Keller Geoteknikk lands €42m Norway contract
News article
Keller Geoteknikk lands €42m Norway contract News article category Project Keller Geoteknikk AS has been awarded a contract worth €42m for soil stabilisation and grouting works on a major…
/en/news/keller-geoteknikk-lands-eu42m-norway-contract
Coronavirus outbreak
News article
Coronavirus outbreak News article category Workplace and people Keller is a global company with many employees and we are aware that we must take our responsibility in society to ensure the well-…
/en/news/coronavirus-outbreak
HAB-FOLLOLINE K147
Project
HAB-FOLLOLINE K147 Execution of steel core piles with lengths up to 50m in a restricted access area. Many underground service lines in working area existing, which were obstacles to drilling and lead…
/en/projects/hab-folloline-k147
Download
https://youtu.be/PAyh3VXU508
Keller Follo Line Documentary
Resource
Keller Follo Line Documentary Follo Line - How Keller works Video Have you always wanted to know how Keller carries out a large construction site? This documentary gives you an insight into our…
/en/node/2911
Parkveien 4, Langhus
Project
Parkveien 4, Langhus Keller installed around 2400 pcs of Ø600 mm and Ø800 mm Lime Cement Columns as ground stabilization for a new apartment building in Langhus. The Lime Cement columns were…
/en/projects/parkveien-4-langhus
Miklagard Fase 2
Project
Miklagard Fase 2 Keller installed around 3000 pcs of Ø800mm Lime Cement Columns as ground stabilization for a new Hotel in Kløfta. The ground consisted of soft clay and had to be stabilized before…
/en/projects/miklagard-fase-2
Wildenvey Park
Project
Wildenvey Park Keller installed 378 pcs of Ø600mm Lime Cement Columns within a small construction pit in Mjøndalen. The construction pit was made to establish a pump station to control future flood…
/en/projects/wildenvey-park
Radium Hospital Project
News article
Radium Hospital Project News article category Project Keller Geoteknikk AS is pleased to announce that work has started with the first investigation drillings for the new Radium Hospital in Oslo. HAB…
/en/news/radium-hospital-project
Bernt Akers Gate 6
Project
Bernt Akers Gate 6 Keller installed 20 pcs of jet grouting columns with diameters of 1,5 m, 1,6 m and 2,0 m and lengths varying from 3 to 16 meters in clay. All columns was installed from within the…
/en/projects/bernt-akers-gate-6

Pagination

  • Previous page ‹‹
  • Page 3
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Geoteknikk AS

Keller Geoteknikk AS
Hovfaret 13
0275 Oslo

Footer links
  • Keller Group
  • Careers

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • YouTube