Skip to main content
english
  • norsk
  • english
+47 467 49 286
Service Menu
  • News
  • Events
  • Resources
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Dry soil mixing
        • Dynamic compaction
        • Mass mixing
        • Wet soil mixing
        • Wick / PVDs / band drains
      • Grouting
        • Cavity / bulk / mine fill grouting
        • Compensation / fracture grouting
        • Jet grouting
        • Compaction grouting
        • Permeation grouting
        • Rock / fissure grouting
      • Deep foundations
        • CFA piles (auger cast)
        • Driven precast piles
        • Ductile iron piles
        • Micropiles
        • Bored piles / drilled shafts
        • Macropiles
      • Earth retention
        • Contiguous pile walls
        • Secant pile walls
        • Ground anchors
        • SBMA
        • Soil nails
        • Sheet piles
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Liquefaction mitigation
        • Heavy foundations
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Stabilisation
        • Mine stabilisation/void filling
        • Tunnelling
      • Slope stabilisation
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Diversity and inclusion
    • Quality
    • Sustainability
  • About us
    • Our team
    • About Keller Group
  • Careers
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Invoicing

Search results

Filter results

  • All results (205)
  • Project (74)
  • Content page (35)
  • Resource (32)
  • Technique (23)
  • News article (17)
  • Solution (10)
  • Market (6)
  • Landing page (3)
  • Event (2)
  • Vacancy (2)
  • Office (1)
Request a quote
Get assistance
Fornebubanen - K2F Lysaker
Project
Fornebubanen - K2F Lysaker • Keller installed an interlocking pile wall consisting of 139 pcs Ø406 casings and 11 pcs of drilled strand anchors to support the pile wall. • Steel Core Piles Ø150mm…
/en/projects/fornebubanen-k2f-lysaker
Fornebubanen - K2A Fornebu
Project
Fornebubanen - K2A Fornebu • Keller installed about 1800 pcs of Ø800 mm lime-cement columns to stabilize the ground in a new building pit in connection to the new Fornebubanen. • Keller executed…
/en/projects/fornebubanen-k2a-fornebu
Osebakken BT1
Project
Osebakken BT1 Keller installed close to 142.000 linear meters of 600mm diameter DDSM columns reaching to a maximum depth of 25m. Cement-lime columns (DDSM) were installed not only to increase the…
/en/projects/osebakken-bt1
Circle K - SMS2A
Project
Circle K - SMS2A Treatment of the D&B Tunnel crown from ground surface by means of Jet Grouting. Execution performed up to 30m depth including inclined columns and restricted working height…
/en/projects/circle-k-sms2a
E6 - Hommelvik
Project
E6 - Hommelvik • Combi Wall installation consisting of 323.9 x 12.5mm interlocking casings. • Works performed in close vicinity to Homla river with a high ground water level. • Works performed in…
/en/projects/e6-hommelvik
Ground investigations - E6 Roterud-Storhove
Project
Ground investigations - E6 Roterud-Storhove • Ground investigations for sampling of loose soil material with a diameter of 102mm. • 3m drilling into compact bedrock. • Telescopic drilling up to 50m…
/en/projects/ground-investigations-e6-roterud-storhove
Nittedal Station
Project
Nittedal Station Keller installed about 300 pcs Ø323 casings for a pile wall and two rows of 78 pcs of anchors. All works were done during shutdown of the railway line or very close to the railway in…
/en/projects/nittedal-station-0
Frevar KF
Project
Frevar KF Ground improvement by drainage, applying prefabricated vertical drains (PVD). Quantities: 3183 pcs were installed and anchored at 20m depth. Required pre-drilling due to hard soil…
/en/projects/frevar-kf
Asper Hageby
Project
Asper Hageby • Treatment of the soil to provide stabilization for excavation and support of the building foundation. • Quantities: 7.194 pcs / 112.176m (Drilling) / 92.307m (Stabilized) • Execution…
/en/projects/asper-hageby
Skårerparken
Project
Skårerparken Keller stabilized about 7000 m3 of sensitive clay with the mass soil mixing technique for the construction of a new park, Skårerparken in Lørenskog. The soil stabilization was executed…
/en/projects/skarerparken
Gjerdrum Rasgrop
Project
Gjerdrum Rasgrop Keller installed about 17 500 pcs of vertical drains with a total installation length of about 250 000 m. All drains were installed with Keller's own vertical drain machine. Due…
/en/projects/gjerdrum-rasgrop
Drammen Helsepark
Project
Drammen Helsepark Keller installed about 110 000 meter of Ø800 mm lime-cement columns to stabilize the ground for the new project Drammen Helsepark at Brakerøya in Drammen. The works was partly…
/en/projects/drammen-helsepark
Os Skole
Project
Os Skole Keller installed around 11550 pcs of Ø600 mm and Ø800 mm Lime Cement Columns as ground stabilization for the new arena and extension building for Os Skole using 2 rigs for a total of 175.…
/en/projects/os-skole
Nye Hjorten Teater
Project
Nye Hjorten Teater Keller installed 24 pcs of Soilcrete® Columns Ø2.20 m. Special execution sequence to avoid settlements-uplifting. 1 Dewatering plant in place with minimal environmental footprint.…
/en/projects/nye-hjorten-teater
KS-2 Tangenvika bru
Project
KS-2 Tangenvika bru Keller performed soil investigations from a barge with water depths up to 50m CPTu with predrilling in stages were performed through very heterogeneous lake sediments. In total,…
/en/projects/ks-2-tangenvika-bru
Valla Bru
Project
Valla Bru Execution of a steel pile foundation with a diameter of 914mm by using the Reverse Circulation drilling method (RC-drilling). Challenging environmental aspects. Valla Bru Valla Bru The…
/en/projects/valla-bru
E103 Ramstadsletta
Project
E103 Ramstadsletta • Keller installed about 7800 pcs of Ø800 mm and 2800 pcs of Ø600 lime-cement columns to stabilize the ground in a new building pit in connection to the new E18. There were also…
/en/projects/e103-ramstadsletta
Kvellandsbru E39 - Lyngdal
Project
Kvellandsbru E39 - Lyngdal The foundation contains 24 bored piles with a max. length of 22 m. The piles have a diameter of 1.5 m, drilled 0.5 m into bedrock. Temporary segmental casing, no DTH hammer…
/en/projects/kvellandsbru-e39-lyngdal
Norcem Brevik CCS
Project
Norcem Brevik CCS 319 Steel Piles with a max. length of 34m. 20 Steel Core Piles with a max. length of 34m.  Pile diameters between 170mm and 320mm.  Water drilling technique with DTH hammer. Norcem…
/en/projects/norcem-brevik-ccs
Amtmannvegen, Molde
Project
Amtmannvegen, Molde In relation to works with a new sewage line in Molde, Keller stabilized the quick clay in the ground by using Mass Soil Mixing rig. The Mass Soil Mixing were executed using a 7m…
/en/projects/amtmannvegen-molde

Pagination

  • Previous page ‹‹
  • Page 3
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Geoteknikk AS

Keller Geoteknikk AS
Hovfaret 13
0275 Oslo

Footer links
  • Keller Group
  • Careers

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • YouTube