Skip to main content
english
norsk
english
+47 467 49 286
Service Menu
News
Events
Resources
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Dry soil mixing
Dynamic compaction
Mass mixing
Wet soil mixing
Wick / PVDs / band drains
Grouting
Cavity / bulk / mine fill grouting
Compensation / fracture grouting
Jet grouting
Compaction grouting
Permeation grouting
Rock / fissure grouting
Deep foundations
CFA piles (auger cast)
Driven precast piles
Ductile iron piles
Micropiles
Bored piles / drilled shafts
Macropiles
Earth retention
Contiguous pile walls
Secant pile walls
Ground anchors
SBMA
Soil nails
Sheet piles
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Liquefaction mitigation
Heavy foundations
Re-levelling structures
Underpinning
Containment
Excavation support
Stabilisation
Mine stabilisation/void filling
Tunnelling
Slope stabilisation
Markets
Commercial
Industrial
Infrastructure
Institutional / public
Power
Residential
Projects
How we work
Code of conduct
Values
Health and safety
Diversity and inclusion
Quality
Sustainability
About us
Our team
About Keller Group
Careers
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Invoicing
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Fornebubanen - K2F Lysaker
Project
Fornebubanen - K2F Lysaker • Keller installed an interlocking pile wall consisting of 139 pcs Ø406 casings and 11 pcs of drilled strand anchors to support the pile wall. • Steel Core Piles Ø150mm…
/en/projects/fornebubanen-k2f-lysaker
Fornebubanen - K2A Fornebu
Project
Fornebubanen - K2A Fornebu • Keller installed about 1800 pcs of Ø800 mm lime-cement columns to stabilize the ground in a new building pit in connection to the new Fornebubanen. • Keller executed…
/en/projects/fornebubanen-k2a-fornebu
Osebakken BT1
Project
Osebakken BT1 Keller installed close to 142.000 linear meters of 600mm diameter DDSM columns reaching to a maximum depth of 25m. Cement-lime columns (DDSM) were installed not only to increase the…
/en/projects/osebakken-bt1
Circle K - SMS2A
Project
Circle K - SMS2A Treatment of the D&B Tunnel crown from ground surface by means of Jet Grouting. Execution performed up to 30m depth including inclined columns and restricted working height…
/en/projects/circle-k-sms2a
E6 - Hommelvik
Project
E6 - Hommelvik • Combi Wall installation consisting of 323.9 x 12.5mm interlocking casings. • Works performed in close vicinity to Homla river with a high ground water level. • Works performed in…
/en/projects/e6-hommelvik
Ground investigations - E6 Roterud-Storhove
Project
Ground investigations - E6 Roterud-Storhove • Ground investigations for sampling of loose soil material with a diameter of 102mm. • 3m drilling into compact bedrock. • Telescopic drilling up to 50m…
/en/projects/ground-investigations-e6-roterud-storhove
Nittedal Station
Project
Nittedal Station Keller installed about 300 pcs Ø323 casings for a pile wall and two rows of 78 pcs of anchors. All works were done during shutdown of the railway line or very close to the railway in…
/en/projects/nittedal-station-0
Frevar KF
Project
Frevar KF Ground improvement by drainage, applying prefabricated vertical drains (PVD). Quantities: 3183 pcs were installed and anchored at 20m depth. Required pre-drilling due to hard soil…
/en/projects/frevar-kf
Asper Hageby
Project
Asper Hageby • Treatment of the soil to provide stabilization for excavation and support of the building foundation. • Quantities: 7.194 pcs / 112.176m (Drilling) / 92.307m (Stabilized) • Execution…
/en/projects/asper-hageby
Skårerparken
Project
Skårerparken Keller stabilized about 7000 m3 of sensitive clay with the mass soil mixing technique for the construction of a new park, Skårerparken in Lørenskog. The soil stabilization was executed…
/en/projects/skarerparken
Gjerdrum Rasgrop
Project
Gjerdrum Rasgrop Keller installed about 17 500 pcs of vertical drains with a total installation length of about 250 000 m. All drains were installed with Keller's own vertical drain machine. Due…
/en/projects/gjerdrum-rasgrop
Drammen Helsepark
Project
Drammen Helsepark Keller installed about 110 000 meter of Ø800 mm lime-cement columns to stabilize the ground for the new project Drammen Helsepark at Brakerøya in Drammen. The works was partly…
/en/projects/drammen-helsepark
Os Skole
Project
Os Skole Keller installed around 11550 pcs of Ø600 mm and Ø800 mm Lime Cement Columns as ground stabilization for the new arena and extension building for Os Skole using 2 rigs for a total of 175.…
/en/projects/os-skole
Nye Hjorten Teater
Project
Nye Hjorten Teater Keller installed 24 pcs of Soilcrete® Columns Ø2.20 m. Special execution sequence to avoid settlements-uplifting. 1 Dewatering plant in place with minimal environmental footprint.…
/en/projects/nye-hjorten-teater
KS-2 Tangenvika bru
Project
KS-2 Tangenvika bru Keller performed soil investigations from a barge with water depths up to 50m CPTu with predrilling in stages were performed through very heterogeneous lake sediments. In total,…
/en/projects/ks-2-tangenvika-bru
Valla Bru
Project
Valla Bru Execution of a steel pile foundation with a diameter of 914mm by using the Reverse Circulation drilling method (RC-drilling). Challenging environmental aspects. Valla Bru Valla Bru The…
/en/projects/valla-bru
E103 Ramstadsletta
Project
E103 Ramstadsletta • Keller installed about 7800 pcs of Ø800 mm and 2800 pcs of Ø600 lime-cement columns to stabilize the ground in a new building pit in connection to the new E18. There were also…
/en/projects/e103-ramstadsletta
Kvellandsbru E39 - Lyngdal
Project
Kvellandsbru E39 - Lyngdal The foundation contains 24 bored piles with a max. length of 22 m. The piles have a diameter of 1.5 m, drilled 0.5 m into bedrock. Temporary segmental casing, no DTH hammer…
/en/projects/kvellandsbru-e39-lyngdal
Norcem Brevik CCS
Project
Norcem Brevik CCS 319 Steel Piles with a max. length of 34m. 20 Steel Core Piles with a max. length of 34m. Pile diameters between 170mm and 320mm. Water drilling technique with DTH hammer. Norcem…
/en/projects/norcem-brevik-ccs
Amtmannvegen, Molde
Project
Amtmannvegen, Molde In relation to works with a new sewage line in Molde, Keller stabilized the quick clay in the ground by using Mass Soil Mixing rig. The Mass Soil Mixing were executed using a 7m…
/en/projects/amtmannvegen-molde
Pagination
Previous page
‹‹
Page 3
Next page
››