Skip to main content
english
norsk
english
+47 467 49 286
Service Menu
News
Events
Resources
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Dry soil mixing
Dynamic compaction
Mass mixing
Wet soil mixing
Wick / PVDs / band drains
Grouting
Cavity / bulk / mine fill grouting
Compensation / fracture grouting
Jet grouting
Compaction grouting
Permeation grouting
Rock / fissure grouting
Deep foundations
CFA piles (auger cast)
Driven precast piles
Ductile iron piles
Micropiles
Bored piles / drilled shafts
Macropiles
Earth retention
Contiguous pile walls
Secant pile walls
Ground anchors
SBMA
Soil nails
Sheet piles
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Liquefaction mitigation
Heavy foundations
Re-levelling structures
Underpinning
Containment
Excavation support
Stabilisation
Mine stabilisation/void filling
Tunnelling
Slope stabilisation
Markets
Commercial
Industrial
Infrastructure
Institutional / public
Power
Residential
Projects
How we work
Code of conduct
Values
Health and safety
Diversity and inclusion
Quality
Sustainability
About us
Our team
About Keller Group
Careers
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Invoicing
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Download
Evje Ridehall
Resource
Evje Ridehall DDSM Evje Ridehall Infosheet Hersleth AS had been contracted by Alexandra G. Andresen to execute the project with setting up a new building for horse-riding in Dilling, near Moss. In…
/en/node/3251
Download
Ekerød Felt
Resource
Ekerød Felt Vertical drains Infosheet A new housing area were to be established in Fredrikstad in an area with varying soil conditions, varying depths to bedrock and soft/sensitive clay in the ground…
/en/node/3256
Fornebubanen - K2F Lysaker
Project
Fornebubanen - K2F Lysaker • Keller installed an interlocking pile wall consisting of 139 pcs Ø406 casings and 11 pcs of drilled strand anchors to support the pile wall. • Steel Core Piles Ø150mm…
/en/projects/fornebubanen-k2f-lysaker
Fornebubanen - K2A Fornebu
Project
Fornebubanen - K2A Fornebu • Keller installed about 1800 pcs of Ø800 mm lime-cement columns to stabilize the ground in a new building pit in connection to the new Fornebubanen. • Keller executed…
/en/projects/fornebubanen-k2a-fornebu
Markets
Landing page
Markets Commercial Keller provides geotechnical solutions for offices, hotels, distribution centres, retail, data centres, and other structures. Keller provides geotechnical solutions for offices,…
/en/expertise/markets
Osebakken BT1
Project
Osebakken BT1 Keller installed close to 142.000 linear meters of 600mm diameter DDSM columns reaching to a maximum depth of 25m. Cement-lime columns (DDSM) were installed not only to increase the…
/en/projects/osebakken-bt1
Circle K - SMS2A
Project
Circle K - SMS2A Treatment of the D&B Tunnel crown from ground surface by means of Jet Grouting. Execution performed up to 30m depth including inclined columns and restricted working height…
/en/projects/circle-k-sms2a
Download
Circle K - SMS2A
Resource
Circle K - SMS2A Jet Grouting - Circle K Infosheet The Circle K section is one part of the six sub-areas within the project. This section sits directly above the new tunnel which will pass through an…
/en/node/3281
E6 - Hommelvik
Project
E6 - Hommelvik • Combi Wall installation consisting of 323.9 x 12.5mm interlocking casings. • Works performed in close vicinity to Homla river with a high ground water level. • Works performed in…
/en/projects/e6-hommelvik
Ground investigations - E6 Roterud-Storhove
Project
Ground investigations - E6 Roterud-Storhove • Ground investigations for sampling of loose soil material with a diameter of 102mm. • 3m drilling into compact bedrock. • Telescopic drilling up to 50m…
/en/projects/ground-investigations-e6-roterud-storhove
Nittedal Station
Project
Nittedal Station Keller installed about 300 pcs Ø323 casings for a pile wall and two rows of 78 pcs of anchors. All works were done during shutdown of the railway line or very close to the railway in…
/en/projects/nittedal-station-0
Site Manager
Vacancy
Site Manager Position available at multiple locations Deadline 31 August 2025 In line with increasing growth of Keller Norway, we are looking for a highly motivated and experienced Site Manager to…
/en/careers/vacancies/site-manager
Frevar KF
Project
Frevar KF Ground improvement by drainage, applying prefabricated vertical drains (PVD). Quantities: 3183 pcs were installed and anchored at 20m depth. Required pre-drilling due to hard soil…
/en/projects/frevar-kf
Infrastructure
Market
Infrastructure Keller is actively involved in efforts to upgrade infrastructure throughout Norway. Whether it is transportation, railways, tunnels or utilities, we provide geotechnical solutions for…
/en/expertise/markets/infrastructure
Pile foundation in Engeløya
News article
Pile foundation in Engeløya News article category Project Keller Geoteknikk AS mobilized in Engeløya to install pile foundations for the new bridge construction. Foundation piles (1016mm diameter)…
/en/news/pile-foundation-engeloya
Signed contract Tangenvika Railway Bridge
News article
Signed contract Tangenvika Railway Bridge News article category Project Keller Geoteknikk executes supplementary ground investigations, starting already this summer, as well as steel core piles, pile…
/en/news/signed-contract-tangenvika-railway-bridge
Asper Hageby
Project
Asper Hageby • Treatment of the soil to provide stabilization for excavation and support of the building foundation. • Quantities: 7.194 pcs / 112.176m (Drilling) / 92.307m (Stabilized) • Execution…
/en/projects/asper-hageby
Skårerparken
Project
Skårerparken Keller stabilized about 7000 m3 of sensitive clay with the mass soil mixing technique for the construction of a new park, Skårerparken in Lørenskog. The soil stabilization was executed…
/en/projects/skarerparken
Gjerdrum Rasgrop
Project
Gjerdrum Rasgrop Keller installed about 17 500 pcs of vertical drains with a total installation length of about 250 000 m. All drains were installed with Keller's own vertical drain machine. Due…
/en/projects/gjerdrum-rasgrop
Drammen Helsepark
Project
Drammen Helsepark Keller installed about 110 000 meter of Ø800 mm lime-cement columns to stabilize the ground for the new project Drammen Helsepark at Brakerøya in Drammen. The works was partly…
/en/projects/drammen-helsepark
Pagination
Previous page
‹‹
Page 7
Next page
››