Skip to main content
english
  • norsk
  • english
+47 467 49 286
Service Menu
  • News
  • Events
  • Resources
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Dry soil mixing
        • Dynamic compaction
        • Mass mixing
        • Wet soil mixing
        • Wick / PVDs / band drains
      • Grouting
        • Cavity / bulk / mine fill grouting
        • Compensation / fracture grouting
        • Jet grouting
        • Compaction grouting
        • Permeation grouting
        • Rock / fissure grouting
      • Deep foundations
        • CFA piles (auger cast)
        • Driven precast piles
        • Ductile iron piles
        • Micropiles
        • Bored piles / drilled shafts
        • Macropiles
      • Earth retention
        • Contiguous pile walls
        • Secant pile walls
        • Ground anchors
        • SBMA
        • Soil nails
        • Sheet piles
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Liquefaction mitigation
        • Heavy foundations
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Stabilisation
        • Mine stabilisation/void filling
        • Tunnelling
      • Slope stabilisation
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Diversity and inclusion
    • Quality
    • Sustainability
  • About us
    • Our team
    • About Keller Group
  • Careers
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Invoicing

Search results

Filter results

  • All results (205)
  • Project (74)
  • Content page (35)
  • Resource (32)
  • Technique (23)
  • News article (17)
  • Solution (10)
  • Market (6)
  • Landing page (3)
  • Event (2)
  • Vacancy (2)
  • Office (1)
Request a quote
Get assistance
Download
Evje Ridehall
Resource
Evje Ridehall DDSM Evje Ridehall Infosheet Hersleth AS had been contracted by Alexandra G. Andresen to execute the project with setting up a new building for horse-riding in Dilling, near Moss. In…
/en/node/3251
Download
Ekerød Felt
Resource
Ekerød Felt Vertical drains Infosheet A new housing area were to be established in Fredrikstad in an area with varying soil conditions, varying depths to bedrock and soft/sensitive clay in the ground…
/en/node/3256
Fornebubanen - K2F Lysaker
Project
Fornebubanen - K2F Lysaker • Keller installed an interlocking pile wall consisting of 139 pcs Ø406 casings and 11 pcs of drilled strand anchors to support the pile wall. • Steel Core Piles Ø150mm…
/en/projects/fornebubanen-k2f-lysaker
Fornebubanen - K2A Fornebu
Project
Fornebubanen - K2A Fornebu • Keller installed about 1800 pcs of Ø800 mm lime-cement columns to stabilize the ground in a new building pit in connection to the new Fornebubanen. • Keller executed…
/en/projects/fornebubanen-k2a-fornebu
Markets
Landing page
Markets Commercial Keller provides geotechnical solutions for offices, hotels, distribution centres, retail, data centres, and other structures. Keller provides geotechnical solutions for offices,…
/en/expertise/markets
Osebakken BT1
Project
Osebakken BT1 Keller installed close to 142.000 linear meters of 600mm diameter DDSM columns reaching to a maximum depth of 25m. Cement-lime columns (DDSM) were installed not only to increase the…
/en/projects/osebakken-bt1
Circle K - SMS2A
Project
Circle K - SMS2A Treatment of the D&B Tunnel crown from ground surface by means of Jet Grouting. Execution performed up to 30m depth including inclined columns and restricted working height…
/en/projects/circle-k-sms2a
Download
Circle K - SMS2A
Resource
Circle K - SMS2A Jet Grouting - Circle K Infosheet The Circle K section is one part of the six sub-areas within the project. This section sits directly above the new tunnel which will pass through an…
/en/node/3281
E6 - Hommelvik
Project
E6 - Hommelvik • Combi Wall installation consisting of 323.9 x 12.5mm interlocking casings. • Works performed in close vicinity to Homla river with a high ground water level. • Works performed in…
/en/projects/e6-hommelvik
Ground investigations - E6 Roterud-Storhove
Project
Ground investigations - E6 Roterud-Storhove • Ground investigations for sampling of loose soil material with a diameter of 102mm. • 3m drilling into compact bedrock. • Telescopic drilling up to 50m…
/en/projects/ground-investigations-e6-roterud-storhove
Nittedal Station
Project
Nittedal Station Keller installed about 300 pcs Ø323 casings for a pile wall and two rows of 78 pcs of anchors. All works were done during shutdown of the railway line or very close to the railway in…
/en/projects/nittedal-station-0
Site Manager
Vacancy
Site Manager Position available at multiple locations Deadline 31 August 2025 In line with increasing growth of Keller Norway, we are looking for a highly motivated and experienced Site Manager to…
/en/careers/vacancies/site-manager
Frevar KF
Project
Frevar KF Ground improvement by drainage, applying prefabricated vertical drains (PVD). Quantities: 3183 pcs were installed and anchored at 20m depth. Required pre-drilling due to hard soil…
/en/projects/frevar-kf
Infrastructure
Market
Infrastructure Keller is actively involved in efforts to upgrade infrastructure throughout Norway. Whether it is transportation, railways, tunnels or utilities, we provide geotechnical solutions for…
/en/expertise/markets/infrastructure
Pile foundation in Engeløya
News article
Pile foundation in Engeløya News article category Project Keller Geoteknikk AS mobilized in Engeløya to install pile foundations for the new bridge construction. Foundation piles (1016mm diameter)…
/en/news/pile-foundation-engeloya
Signed contract Tangenvika Railway Bridge
News article
Signed contract Tangenvika Railway Bridge News article category Project Keller Geoteknikk executes supplementary ground investigations, starting already this summer, as well as steel core piles, pile…
/en/news/signed-contract-tangenvika-railway-bridge
Asper Hageby
Project
Asper Hageby • Treatment of the soil to provide stabilization for excavation and support of the building foundation. • Quantities: 7.194 pcs / 112.176m (Drilling) / 92.307m (Stabilized) • Execution…
/en/projects/asper-hageby
Skårerparken
Project
Skårerparken Keller stabilized about 7000 m3 of sensitive clay with the mass soil mixing technique for the construction of a new park, Skårerparken in Lørenskog. The soil stabilization was executed…
/en/projects/skarerparken
Gjerdrum Rasgrop
Project
Gjerdrum Rasgrop Keller installed about 17 500 pcs of vertical drains with a total installation length of about 250 000 m. All drains were installed with Keller's own vertical drain machine. Due…
/en/projects/gjerdrum-rasgrop
Drammen Helsepark
Project
Drammen Helsepark Keller installed about 110 000 meter of Ø800 mm lime-cement columns to stabilize the ground for the new project Drammen Helsepark at Brakerøya in Drammen. The works was partly…
/en/projects/drammen-helsepark

Pagination

  • Previous page ‹‹
  • Page 7
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Geoteknikk AS

Keller Geoteknikk AS
Hovfaret 13
0275 Oslo

Footer links
  • Keller Group
  • Careers

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • YouTube