Skip to main content
english
  • norsk
  • english
+47 467 49 286
Service Menu
  • News
  • Events
  • Resources
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Dry soil mixing
        • Mass mixing
        • Wet soil mixing
        • Wick / PVDs / band drains
      • Grouting
        • Cavity / bulk / mine fill grouting
        • Compensation / fracture grouting
        • Jet grouting
        • Compaction grouting
        • Permeation grouting
        • Rock / fissure grouting
      • Deep foundations
        • CFA piles (auger cast)
        • Driven precast piles
        • Ductile iron piles
        • Micropiles
        • Bored piles / drilled shafts
      • Earth retention
        • Contiguous pile walls
        • Secant pile walls
        • Ground anchors
        • SBMA
        • Soil nails
        • Sheet piles
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Liquefaction mitigation
        • Heavy foundations
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Stabilisation
        • Mine stabilisation/void filling
        • Tunnelling
      • Slope stabilisation
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Diversity and inclusion
    • Quality
    • Sustainability
  • About us
    • Our team
    • About Keller Group
  • Careers
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Invoicing

Search results

Filter results

  • All results (196)
  • Content page (35)
  • Event (2)
  • Market (6)
  • News article (16)
  • Office (1)
  • Project (71)
  • Resource (32)
  • Solution (10)
  • Technique (21)
  • Vacancy (2)
Request a quote
Get assistance
Osebakken BT1
Project
/en/projects/osebakken-bt1
Circle K - SMS2A
Project
/en/projects/circle-k-sms2a
Download
Circle K - SMS2A
Resource
The Circle K section is one part of the six sub-areas within the project. This section sits directly above the new tunnel which will pass through an area of unconsolidated soils and a thin bedrock layer. It is necessary to stabilize this area to prevent subsidence of the soil as tunnel drilling…
/en/node/3281
E6 - Hommelvik
Project
/en/projects/e6-hommelvik
Ground investigations - E6 Roterud-Storhove
Project
/en/projects/ground-investigations-e6-roterud-storhove
Nittedal Station
Project
/en/projects/nittedal-station-0
Frevar KF
Project
/en/projects/frevar-kf
Pile foundation in Engeløya
News article

Keller Geoteknikk AS mobilized in Engeløya to install pile foundations for the new bridge construction.



Foundation piles (1016mm diameter) are drilled from the barge in reverse circulation (RC) technology in order to comply with the design requirements. Piling works will…

/en/news/pile-foundation-engeloya
Signed contract Tangenvika Railway Bridge
News article

Keller Geoteknikk executes supplementary ground investigations, starting already this summer, as well as steel core piles, pile retaining wall and a temporary dock.


Signerte kontrakt om Tangevika…

/en/news/signed-contract-tangenvika-railway-bridge
Asper Hageby
Project
/en/projects/asper-hageby
Skårerparken
Project
/en/projects/skarerparken
Gjerdrum Rasgrop
Project
/en/projects/gjerdrum-rasgrop
Drammen Helsepark
Project
/en/projects/drammen-helsepark
Ground improvement in Gjerdrum
News article

In Desember 2020, a large quick clay landslide occurred in a residential area in Gjerdrum. The landslide had an estimated size of about 1,1 million m3. NVE got the responsibility to secure the landslide area and stabilize the ground for future use. It was decided to use vertical drains to…

/en/news/ground-improvement-gjerdrum
Os Skole
Project
/en/projects/os-skole
Nye Hjorten Teater
Project
/en/projects/nye-hjorten-teater
KS-2 Tangenvika bru
Project
/en/projects/ks-2-tangenvika-bru
Valla Bru
Project
/en/projects/valla-bru
Download
/en/sites/keller-geoteknikk-en/files/2022-12/videoplayback.mp4
Norway SMS2a - summer edition 2022
Resource
Watch our latest video on the SMS2a project in Norway. The Sandbukta-Moss-Sastad project is part of the intercity development project, which is part of the largest transport project in Norway, consisting of 270km of new double-track rail. Throughout the project, we execute dry deep soil mixing, jet…
/node/3381
E103 Ramstadsletta
Project
/en/projects/e103-ramstadsletta
  • Show more results
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Geoteknikk AS

Keller Geoteknikk AS
Hovfaret 13
0275 Oslo

Footer links
  • Keller Group
  • Careers

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • YouTube