Skip to main content
english
  • norsk
  • english
+47 467 49 286
Service Menu
  • News
  • Events
  • Resources
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Dry soil mixing
        • Mass mixing
        • Wet soil mixing
        • Wick / PVDs / band drains
      • Grouting
        • Cavity / bulk / mine fill grouting
        • Compensation / fracture grouting
        • Jet grouting
        • Compaction grouting
        • Permeation grouting
        • Rock / fissure grouting
      • Deep foundations
        • CFA piles (auger cast)
        • Driven precast piles
        • Ductile iron piles
        • Micropiles
        • Bored piles / drilled shafts
      • Earth retention
        • Contiguous pile walls
        • Secant pile walls
        • Ground anchors
        • SBMA
        • Soil nails
        • Sheet piles
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Liquefaction mitigation
        • Heavy foundations
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Stabilisation
        • Mine stabilisation/void filling
        • Tunnelling
      • Slope stabilisation
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Diversity and inclusion
    • Quality
    • Sustainability
  • About us
    • Our team
    • About Keller Group
  • Careers
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Invoicing

Search results

Filter results

  • All results (196)
  • Content page (35)
  • Event (2)
  • Market (6)
  • News article (16)
  • Office (1)
  • Project (71)
  • Resource (32)
  • Solution (10)
  • Technique (21)
  • Vacancy (2)
Request a quote
Get assistance
Kvellandsbru E39 - Lyngdal
Project
/en/projects/kvellandsbru-e39-lyngdal
Norcem Brevik CCS
Project
/en/projects/norcem-brevik-ccs
Amtmannvegen, Molde
Project
/en/projects/amtmannvegen-molde
FV47 Karmsundgata
Project
/en/projects/fv47-karmsundgata
Sørlandstunet BT1-BT2 Piren
Project
/en/projects/sorlandstunet-bt1-bt2-piren
Vestbanen - Nobels Fredssenter
Project
/en/projects/vestbanen-nobels-fredssenter
E-18 Grava
Project
/en/projects/e-18-grava
Signed contract for trial piling in Mjøsa
News article

Keller has signed a contract with Nye Veier for trial piling for the new Mjøsa bridge. The purpose is to collect more data on the ground conditions in Mjøsa during the summer and autumn of 2023.

The work is part of the planning work for the new E6 Moelv – Roterud. The piles that will be…

/en/news/signed-contract-trial-piling-mjosa
Engeløybrua
Project
/en/projects/engeloybrua
Wet Soil Mixing in Trondheim
News article

Keller Geoteknikk has introduced the Wet Soil Mixing method for the first time in Norway/Trondheim with support of Prof. Michal Topolnicki, Soil Mixing Expert from Keller Poland. The Client (Veidekke) and the consultant/designer (NGI) came up with two different Soil Mixing options to Keller for…

/en/news/wet-soil-mixing-trondheim
Nytt kaianlegg Boliden - Odda
Project
/en/projects/nytt-kaianlegg-boliden-odda
Keller signed a contract with Bane NOR
News article

Bane NOR, responsible for Norway's railway infrastructure, has awarded Keller with a significant contract for ground improvement works in the Sandbukta-Moss-Såstad railway project. Keller Geoteknikk AS has been chosen as the geotechnical contractor for the works in Moss with a value of up to 900…

/en/news/keller-signed-contract-bane-nor
Climate Competition 2023
News article

Since October 17th, Keller employees have been taking steps in their everyday lives to live more environmentally friendly. 

We joined the Ducky Challenge, where we competed with other companies to save as much CO₂e as possible in a set period of time. 

Keller Geoteknikk…

/en/news/climate-competition-2023
Merger between Nordwest Fundamentering and Keller Geoteknikk
News article

On November 15th, 2022, Nordwest Fundamentering AS in Trondheim was acquired by Keller Geoteknikk AS. Keller Geoteknikk and Nordwest Fundamentering announced the merger in September 2023. 

Northwest Fundamentering with their 23 employees, equipment and machines, nevertheless, their…

/en/news/merger-between-nordwest-fundamentering-and-keller-geoteknikk
Invoicing
Content page
/en/invoicing
Holiday greetings from Keller Geoteknikk
News article

We at Keller Geoteknikk wish you all a Merry Christmas and Happy Holidays!

/en/news/holiday-greetings-keller-geoteknikk
E18 Sjølystlokket
Project
/en/projects/e18-sjolystlokket
Foundation of new bridge over Eidselva river in Ulefoss
News article

In week 9, Keller Geoteknikk have mobilized the equipment along with RM20 for the foundation work of a new bridge over Eidselva river in Ulefoss. Our part of works include drilling of 16 pcs steel casings of Ø1016mm, distributed in 2 axes for column foundations and supporting the bridge span.…

/en/news/foundation-new-bridge-over-eidselva-river-ulefoss
Vollsveien 9-11
Project
/en/projects/vollsveien-9-11
Ny Nerlandsøybru
Project
/en/projects/ny-nerlandsoybru
  • Show more results
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Geoteknikk AS

Keller Geoteknikk AS
Hovfaret 13
0275 Oslo

Footer links
  • Keller Group
  • Careers

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • YouTube