Skip to main content
english
  • norsk
  • english
+47 467 49 286
Service Menu
  • News
  • Events
  • Resources
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Dry soil mixing
        • Mass mixing
        • Wet soil mixing
        • Wick / PVDs / band drains
      • Grouting
        • Cavity / bulk / mine fill grouting
        • Compensation / fracture grouting
        • Jet grouting
        • Compaction grouting
        • Permeation grouting
        • Rock / fissure grouting
      • Deep foundations
        • CFA piles (auger cast)
        • Driven precast piles
        • Ductile iron piles
        • Micropiles
        • Bored piles / drilled shafts
      • Earth retention
        • Contiguous pile walls
        • Secant pile walls
        • Ground anchors
        • SBMA
        • Soil nails
        • Sheet piles
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Liquefaction mitigation
        • Heavy foundations
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Stabilisation
        • Mine stabilisation/void filling
        • Tunnelling
      • Slope stabilisation
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Diversity and inclusion
    • Quality
    • Sustainability
  • About us
    • Our team
    • About Keller Group
  • Careers
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Invoicing

Search results

Filter results

  • All results (196)
  • Project (71)
  • Content page (35)
  • Resource (32)
  • Technique (21)
  • News article (16)
  • Solution (10)
  • Market (6)
  • Event (2)
  • Vacancy (2)
  • Office (1)
Request a quote
Get assistance
Download
Åse Bru
Resource
On behalf of the Vestfold og Telemark Fylkeskommune, Morgedal Entreprenør AS has been given responsibility for remediating the Åse bridge. In this regard, there was a need for the establishment of steel pile foundation for the bridge abutment in order to continue the works. The foundation consist…
/en/node/3211
Download
Nittedal Station
Resource
NRC have been contracted by Bane NOR to execute the construction works at Nittedal Station. The Station will be improved with a much longer 2 track line to be able to accommodate longer trains. In this regard it was necessary to construct a pile wall to be able to finish the remaining works. The…
/en/node/3216
Download
Evje Ridehall
Resource
Hersleth AS had been contracted by Alexandra G. Andresen to execute the project with setting up a new building for horse-riding in Dilling, near Moss. In the project there was an area with sensitive clay under the building which had to be stabilized. Keller was therefore contracted as a sub…
/en/node/3221
Download
Brakerøya Station
Resource
HAB Construction have been contracted by Helse Sør-Øst to build the foundations for a new pedestrian bridge over the railway in the train station Brakerøya Stasjon in Drammen. The new bridge will make a connection between the railroad station, the surrounding areas and a new hospital being built…
/en/node/3226
Download
Piren, Mandal
Resource
BRG Entrepreneur was building new apartments at the seafront in Mandal. Driven concrete piles and steel core piles were installed as foundation of a neighbour building. During this application the two adjacent buildings faced differential settlements exceeding 15cm.
/en/node/3231
Download
https://youtu.be/TycVJJK-UQo
Keller Geoteknikk - Summer 2021
Resource
Across the globe, people live, work and play on ground prepared by Keller. Combining a wide range of techniques, Keller solves geotechnical challenges across the entire construction sector – from industrial and commercial to housing, infrastructure and environmental projects. Here is an insight…
/en/node/3236
Download
Mosseveien Portal
Resource
The main part of the works was the construction of a Portal from the transition zone from Drill and Blast to the Cut and Cover tunneling into Oslo S.The first step was the installation of a temporary casing and cleaning of the hole in order to penetrate in the faults of the weakness zone.…
/en/node/3241
Download
Follobanen Railway and Tunnel
Resource
With its large foundation portfolio, Keller asissted the client with several diffrent technologies. Moreover Keller executed several static- and dynamic load tests at site to verify the bearing capacity of the piles. Keller also provides a large machine park, consisting of over 130 drilling…
/en/node/3246
Download
Evje Ridehall
Resource
Hersleth AS had been contracted by Alexandra G. Andresen to execute the project with setting up a new building for horse-riding in Dilling, near Moss. In the project there was an area with sensitive clay under the building which had to be stabilized. Keller was therefore contracted as a sub…
/en/node/3251
Download
Ekerød Felt
Resource
A new housing area were to be established in Fredrikstad in an area with varying soil conditions, varying depths to bedrock and soft/sensitive clay in the ground. Different ground improvement methods to avoid future settlements were considered, but vertical drains were the chosen solution.
/en/node/3256
Download
Circle K - SMS2A
Resource
The Circle K section is one part of the six sub-areas within the project. This section sits directly above the new tunnel which will pass through an area of unconsolidated soils and a thin bedrock layer. It is necessary to stabilize this area to prevent subsidence of the soil as tunnel drilling…
/en/node/3281
Download
/en/sites/keller-geoteknikk-en/files/2022-12/videoplayback.mp4
Norway SMS2a - summer edition 2022
Resource
Watch our latest video on the SMS2a project in Norway. The Sandbukta-Moss-Sastad project is part of the intercity development project, which is part of the largest transport project in Norway, consisting of 270km of new double-track rail. Throughout the project, we execute dry deep soil mixing, jet…
/node/3381
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Geoteknikk AS

Keller Geoteknikk AS
Hovfaret 13
0275 Oslo

Footer links
  • Keller Group
  • Careers

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • YouTube