Skip to main content
english
  • norsk
  • english
+47 467 49 286
Service Menu
  • News
  • Events
  • Resources
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Dry soil mixing
        • Dynamic compaction
        • Mass mixing
        • Wet soil mixing
        • Wick / PVDs / band drains
      • Grouting
        • Cavity / bulk / mine fill grouting
        • Compensation / fracture grouting
        • Jet grouting
        • Compaction grouting
        • Permeation grouting
        • Rock / fissure grouting
      • Deep foundations
        • CFA piles (auger cast)
        • Driven precast piles
        • Ductile iron piles
        • Micropiles
        • Bored piles / drilled shafts
        • Macropiles
      • Earth retention
        • Contiguous pile walls
        • Secant pile walls
        • Ground anchors
        • SBMA
        • Soil nails
        • Sheet piles
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Liquefaction mitigation
        • Heavy foundations
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Stabilisation
        • Mine stabilisation/void filling
        • Tunnelling
      • Slope stabilisation
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Diversity and inclusion
    • Quality
    • Sustainability
  • About us
    • Our team
    • About Keller Group
  • Careers
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Invoicing

Search results

Filter results

  • All results (205)
  • Project (74)
  • Content page (35)
  • Resource (32)
  • Technique (23)
  • News article (17)
  • Solution (10)
  • Market (6)
  • Landing page (3)
  • Event (2)
  • Vacancy (2)
  • Office (1)
Request a quote
Get assistance
Download
Åse Bru
Resource
Åse Bru Bridge Foundation Infosheet On behalf of the Vestfold og Telemark Fylkeskommune, Morgedal Entreprenør AS has been given responsibility for remediating the Åse bridge. In this regard, there…
/en/node/3211
Download
Nittedal Station
Resource
Nittedal Station Pile wall Infosheet NRC have been contracted by Bane NOR to execute the construction works at Nittedal Station. The Station will be improved with a much longer 2 track line to be…
/en/node/3216
Download
Evje Ridehall
Resource
Evje Ridehall Dry Deep Soil Mixing Infosheet Hersleth AS had been contracted by Alexandra G. Andresen to execute the project with setting up a new building for horse-riding in Dilling, near Moss. In…
/en/node/3221
Download
Brakerøya Station
Resource
Brakerøya Station Steel core piles Infosheet HAB Construction have been contracted by Helse Sør-Øst to build the foundations for a new pedestrian bridge over the railway in the train station…
/en/node/3226
Download
Piren, Mandal
Resource
Piren, Mandal Piren, Mandal Infosheet BRG Entrepreneur was building new apartments at the seafront in Mandal. Driven concrete piles and steel core piles were installed as foundation of a neighbour…
/en/node/3231
Download
https://youtu.be/TycVJJK-UQo
Keller Geoteknikk - Summer 2021
Resource
Keller Geoteknikk - Summer 2021 Keller sites in Norway Video Across the globe, people live, work and play on ground prepared by Keller. Combining a wide range of techniques, Keller solves…
/en/node/3236
Download
Mosseveien Portal
Resource
Mosseveien Portal Drill and Blast to the Cut and Cover Infosheet The main part of the works was the construction of a Portal from the transition zone from Drill and Blast to the Cut and Cover…
/en/node/3241
Download
Follobanen Railway and Tunnel
Resource
Follobanen Railway and Tunnel Shutdown Follobanen Infosheet With its large foundation portfolio, Keller asissted the client with several diffrent technologies. Moreover Keller executed several static…
/en/node/3246
Download
Evje Ridehall
Resource
Evje Ridehall DDSM Evje Ridehall Infosheet Hersleth AS had been contracted by Alexandra G. Andresen to execute the project with setting up a new building for horse-riding in Dilling, near Moss. In…
/en/node/3251
Download
Ekerød Felt
Resource
Ekerød Felt Vertical drains Infosheet A new housing area were to be established in Fredrikstad in an area with varying soil conditions, varying depths to bedrock and soft/sensitive clay in the ground…
/en/node/3256
Download
Circle K - SMS2A
Resource
Circle K - SMS2A Jet Grouting - Circle K Infosheet The Circle K section is one part of the six sub-areas within the project. This section sits directly above the new tunnel which will pass through an…
/en/node/3281
Download
/en/sites/keller-geoteknikk-en/files/2022-12/videoplayback.mp4
Norway SMS2a - summer edition 2022
Resource
Norway SMS2a - summer edition 2022 Norway SMS2a - summer edition 2022 Video Watch our latest video on the SMS2a project in Norway. The Sandbukta-Moss-Sastad project is part of the intercity…
/en/node/3381

Pagination

  • Previous page ‹‹
  • Page 2
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Geoteknikk AS

Keller Geoteknikk AS
Hovfaret 13
0275 Oslo

Footer links
  • Keller Group
  • Careers

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • YouTube